In force: 2020-12-31
256. In addition to what is required by section 41, the declaration of compliance for an activity referred to in section 255 must include a declaration from a forest engineer attesting that the project is compliant with the conditions set out in that section and in the Water Withdrawal and Protection Regulation (chapter Q-2, r. 35.2). Despite the first paragraph, in the case of an activity connected with a non-commercial fishing pond, a declaration from an engineer is not required.
871-2020O.C. 871-2020, s. 256.